Subscribe to newsletter

Submit Article

 


Editors Note: Armstrong provide:

  • Water heating

  • Energy management

  • Heating systems

  • Speed pumps

Home

Advertise Here

Request Quote

CPD Seminar

Advertise Job

Advertise Job

Terms & Conditions

Terms & Conditions

Contact Building Design

Contact Building Design

e-mail Building Design

e-mail Building Design

 

- Building Design - Services & Construction Products Index

Request Information

Links Page

 


 

ARMSTRONG 8000 Series Packaged Pump Solutions Speed The Way For Neasden Depot Refurb

Armstrong 8000 Series packaged pump solutions have helped to keep extremely tight project timescales on track for London Underground’s refurbishment of Neasden Depot.

Neasden Depot is the largest depot in the London Underground network, and the main maintenance depot for the Metropolitan Line. The major refurbishment project currently underway at the depot will create facilities suitable to accommodate a new fleet of air conditioned Tube trains.

The scale of the project, and the need to keep disruption to a minimum for passengers, meant that timescales were extremely tight. Main contractor BAM Nuttall and M & E contractor M J Quinn Integrated Services Ltd decided that off-site manufacture would have major benefits for this high-profile project. They approached Armstrong Integrated Limited - experts in off-site manufactured integrated plant rooms and other off-site solutions.

Armstrong 8000 Series pump solutions are complete fluid management systems, which are pre-designed and manufactured off-site, with the capability to be configured to suit the specific application. They offer specifiers lowest first installed cost, reduced footprint and the opportunity for outstanding energy efficiency performance. While work continued on site at Neasden Depot, Armstrong pre-assembled and tested the pump packages at its purpose-designed factory in Halesowen, West Midlands.

The package included a motive power distribution board requiring a single point of mains supply for each module. Control was supplied via an integrated Armstrong IPS multi-zone controller. The controller, mounted on the module and wired in the factory, maximises energy savings by modulating the pump speed to suit demand. On the appropriate date within the build schedule, the modules were delivered to site ready to be assembled into the system pipework.

As the pump solutions had been fully assembled and tested before leaving Armstrong’s factory, many potential risks traditionally associated with major construction projects were eliminated. Key building services elements were carried out concurrently with other parts of the construction phase, avoiding delays and bottle-necks. In addition, on-site installation and commissioning times were reduced considerably.

As 8000 Series pump solutions are pre-designed by Armstrong (a world-leading manufacturer of HVAC equipment with almost 80 years experience in pump design), costs typically incurred by the contractor at system design stage were reduced. In addition, the installed equipment offers the best possible integration of pumps with efficient variable speed pump control technology, to deliver exceptional performance throughout the equipment’s lifetime.

Armstrong Systems Solution Group Director, Dominic Cutts, said, “For a large-scale project such as Neasden Depot, off-site manufacture can be a valuable way of simplifying project management, achieving factory quality, and speeding the installation times. In addition there is a growing awareness that, where the system is integrated with control and automation by the equipment manufacturer, there are opportunities for energy efficiency that cannot generally be achieved when using traditional on-site assembly approaches.”


AkzoNobel Dulux paint Trade paint Decorative paint Gloss paint News 161211

Cembrit Roof tiles Slate tiles Slate roofing Roof cladding News 151211

Danfoss Ground source heat pumps Heat pumps Inverter drives News 151211

Dimplex Air source heat pumps Heat pumps Renewable energy News 161211

Dorma Access control Door closers Door hardware Door operators News 161211

Dulux paint Dulux trade Trade paint Exterior paint News 151211

Dulux paint Dulux trade Trade paint Gloss paint News 131211

Eaton Electric Switch gear Fuse boards Lighting controls Speed drives News 161211

Gent Fire alarms Fire detection Alarm systems Emergency lighting News 131211

Kingfisher Ventilation louvres External lighting Flood lighting Industrial lighting News 121211

Leaderflush Shapland Door sets Timber doors Door hardware Architectural hardware News 161211

Marshall-Tufflex Cable management Energy management Cable trays Data services News 121211

Prysmian Fire cables Armoured cables Power cables Energy cables News 151211

Space Air conditioning systems Air cooled chillers Air conditioning News 151211

Steadmans Wall panels Roofing materials Roof panels Insulated panels News 161211

Tyco Thermal Controls Trace heating Frost protection Pipework insulation Underfloor heating News 151211

UPS Ltd UPS systems Static UPS Modular UPS UPS products News 151211

News Categories:
Water heating Energy management Heating systems Speed pumps

Arundel Jones Associates Ltd
Hill Farm Business Park, Linton Hill, Maidstone, Kent ME17 4AL
Tel : 01622 745333

news@buildingdesign.co.uk


See also:

| BuildingDesign Directory | BuildingDesign Tenders |

|BuildingDesign News Archives | 2006 | 2007 | 2008 | 2009

| BuildingDesign Recruitment | AJA Part Time Jobs Board |

© 2010 copyright all rights reserved Registered in England and Wales No. 07334149