Subscribe to newsletter

Submit Article

 



Editors Note: Legrand provide:

  • Power distribution

  • Cable trays

  • Cable management

  • Cable ladders

Home

Advertise Here

Request Quote

CPD Seminar

Advertise Job

Advertise Job

Terms & Conditions

Terms & Conditions

Contact Building Design

Contact Building Design

e-mail Building Design

e-mail Building Design

 

- Building Design - Services & Construction Products Index

Request Information

Links Page

 


 

LEGRAND Speeds Up Ladder With Fast Fit Innovation

Legrand has further enhanced the fast-fit capability of its Swifts cable ladder with the introduction of an innovative two part quick-fit fastener that halves the number of fixing components while retaining all of the product’s quality.

This latest development follows on from a complete redesign of the range’s fittings that had already reduced installation times when connecting fittings to lengths by over 50 per cent. This was achieved through the introduction of integral couplers on all fittings that significantly reduced the number of components used across all three ladder solutions – medium duty Topaz, heavy duty Sapphire and extra heavy duty Emerald.

Matt Crunden, a marketing manager for Legrand’s cable management division, said: “One of the main reasons for our world leading position in the cable management market is our programme of continual product design and development, which ensures our solutions continue to stand-out from the competition.”

“Most recently we’ve sought to do this by reducing the total installed cost across our cable management range by significantly reducing installation time.”

Further evidence of this policy in practice was seen when Legrand’s new Salamandre distribution trunking was launched earlier this year and was independently proven to be 50 per cent quicker to install than its predecessor.

Fast-fit fastening devices have already proved popular with the company’s Swifts Easi-clip (CKP25), which makes installation of MRF cable tray on to channel support systems fast and economical in comparison with traditional fixing methods. While installation of Legrand’s Swifts SW wire cable tray is enhanced by the innovative Faslock, which is simply located in position before fixing tabs are bent to form a strong, secure bend.

“We feel that the combination of our comprehensive cable management offering and the incorporation within it of an array of fast-fit products and accessories creates a winning solution that will help us retain our market leading position for a long time to come,” concluded Matt.

To find out more about Legrand’s cable management offering please email below:


ABB Energy management system Power factor correction Energy management News 271011

Action Storage Winter kits Grit bins De-icing salt Salt spreaders News 261011

Balcony Systems Glass balconies Juliet balconies Glass balustrades Glass doors News 261011

BDR Thermea Baxi boilers Heat pumps Biomass boilers CPD training News 261011

Breathing Buildings Natural ventilation Ventilation systems Ventilation products Air handling News 241011

Cembrit Roof tiles Cement slates Slate tiles Cement tiles News 271011

CGI International Fire glass Safety glass Architectural glass Acoustic glass News 271011

Codelocks Electronic locks Door locks Locker locks Cabinet locks News 241011

Comar Aluminium systems Curtain walling Entrance systems Structural glass News 271011

Cooper Lighting Fluorescent lighting Energy efficient lighting PIR light sensor News 241011

Eaton Electric Switch gear Distribution boards Circuit protection Electrical switchgear News 251011

Flakt Woods Chilled beams Air handling Chiller equipment Axial fans News 241011

Flakt Woods Heat recovery Ventilation systems Air handling Fan coils News 251011

Forbo Flooring systems Commercial flooring Vinyl flooring Entrance flooring News 241011

Gilberts Air distribution Smoke control Fire control Smoke dampers News 241011

Global Automatics Automatic door operators Automatic doors Sliding door operators News 271011

Haven Shower enclosures Shower doors Shower panels Haven showers News 241011

Hitachi Air source heat pumps Heat pumps Renewable heat News 251011

Honeywell Heating controls Heating thermostats Radiator thermostats Programmable thermostats News 261011

Komfort Partitioning systems Office partitions Storage systems Office interiors News 251011

Laidlaw Internal doors Door hardware Architectural ironmongery Door sets News 261011

Leaderflush Shapland Door sets Timber doors Commercial doors Door hardware News 261011

Legrand Cable trunking Cable management Electrical trunking Power distribution News 261011

London Pumps Water pumps Booster pumps Pump motors Water systems News 241011

Marley Eternit Roof tiles Clay tiles Concrete tiles Cement slates News 261011

Marley Plumbing Rainwater drainage Rainwater systems Drainage systems Ground drainage News 241011

Mitsubishi Electric Heat recovery systems Heat pumps Air conditioning system News 261011

Polypipe Plastic pipe Soil pipe Waste pipe PVC pipe News 241011

Recticel Insulation products Acoustic insulation Thermal insulation Foam insulation News 241011

S and P Coil Products Radiant heating Commercial heating Radiant panels Heat pumps News 251011

SIG Design and Technology Flat roofs Roof systems Green roofs Roof membrane News 251011

Weatherite Commercial kitchen ventilation Kitchen ventilation Kitchen ventilation systems News 271011

News Categories:
Power distribution Cable trays Cable management Cable ladders

Arundel Jones Associates Ltd
Hill Farm Business Park, Linton Hill, Maidstone, Kent ME17 4AL
Tel : 01622 745333

news@buildingdesign.co.uk


See also:

| BuildingDesign Directory | BuildingDesign Tenders |

|BuildingDesign News Archives | 2006 | 2007 | 2008 | 2009

| BuildingDesign Recruitment | AJA Part Time Jobs Board |

© 2010 copyright all rights reserved Registered in England and Wales No. 07334149