Subscribe to newsletter

Submit Article

 



Editors Note: Comar provide:

  • Aluminium systems

  • Curtain walling

  • Entrance systems

  • Structural glass

Home

Advertise Here

Request Quote

CPD Seminar

Advertise Job

Advertise Job

Terms & Conditions

Terms & Conditions

Contact Building Design

Contact Building Design

e-mail Building Design

e-mail Building Design

 

- Building Design - Services & Construction Products Index

Request Information

Links Page

 


 

COMAR - Time Cost Conscious Comar

As a leading British firm with systems designed for the British commercial fenestration market, Comar Architectural Aluminium Systems has been in business for forty years. Comar is 100% British and privately owned this means that Comar, in the current prevailing economic climate, face the same constraints and worries as their approved fabricator network. However, Comar are enjoying unprecedented success and having survived several UK recessions, here, Comar talk about how their systems and business practices are securing record levels of work for their approved fabricator network.

The Importance of Time Critical Delivery

Anyone with experience of British construction knows the time delays that can happen throughout the construction process. Once an order is placed the client/contractor needs to be on-site yesterday, systems companies therefore need to be able to deliver a JIT policy, with products that are available on demand and in full.

In a busy business, costs associated with time are rarely quantified. Dealing with poor suppliers who have unreliable lead times becomes part of the norm - these subsequent costs are swallowed as day-to-day running costs. Conversely, companies will invest in machine tools to maximise production efficiencies, but they rarely look at the efficiency of their suppliers as this involves the short-term pain of changing over to a new unknown, partner.

Some fabricators look at putting profiles in stock to overcome these issues, however, this can tie up valuable liquidity. Liquidity and cash flow is an especially pertinent issue with todayís reduced finance options, so finding a reliable supplier to maximise profitability has never been more important

If, out of the blue, your business has to wait 4-6 weeks for materials and accessories, you and your business will have to wait longer before you can get paid from the contractor/client. This can also impact on manpower hours: overtime might need to be paid to hit a site deadline, reducing the margin on the originally profitable project.

Time Critical Infrastructure

Comar have built their business on market leading stock holding and fast-track delivery. Quite simply Comar have invested over £5M in stock so that their fabricators donít have to, thus freeing up their fabricators valuable financial resources. For polyester powder coating and dual colour Comar have invested in another facility next door to the industry renowned Barley Chalu, ensuring coating commences as soon as the order arrives. Here stocks of mill finish ready to be powder coated speed up coating lead-times to the best in the aluminium industry. Comar carry most profiles in a standard white finish at their head offices so white materials can be delivered to fabricators on their next weekly delivery.

As Comar own and control their own logistics fleet, fabricators can rely on flexibility of delivery when demanded.

Intrinsically, all Comar systems have multi-function profiles and accessories: profiles have been designed so they can be used in a variety of systems and applications. This means fabricator knowledge of the profile range is quickly assimilated and wastage is reduced as profiles can be used on the next project.

In summary Comar is British by Design. This not only means aluminium facades for curtain walling, windows, doors and ground floor treatment that provide longevity and legacy it means a British designed infrastructure to deliver to the uniquely demanding, time-critical British construction market.

Comar: Designed for Performance, Backed by Delivery

For further technical information or pricing, please contact Comarís Marketing Department by email below:

E-mail Comar


Advanced Air Fan coil units Natural ventilation Natural ventilation systems News 191011

AmbiRad Heating systems radiant heaters Commercial heating Air curtains News 181011

Bilco Access doors Smoke vents Floor access Floor doors News 211011

Building Simulation Thermographic surveys Thermal imaging Energy management Building simulation News 171011

Carrier Heat pumps Air conditioning Commercial refrigeration Ventilation systems News 181011

Celotex Thermal insulation Roof insulation Wall insulation Floor insulation News 171011

Charter Specialist Security Security shutters Door shutters Window shutters Roller shutters News 191011

Dimplex PV panels Solar panels Photovoltaic panels Solar energy News 181011

Dimplex Solar PV Solar panels Solar heating Solar energy News 171011

Eaton Electrical products Electrical distribution Power management Hydraulic equipment News 211011

Eaton-Williams Air conditioning Air conditioning units Air handling units News 191011

Eurocare Showers Shower cubicles Shower trays Shower doors Shower screens News 181011

Formica Group Formica laminate Formica sheets Laminate sheets Formica worktops News 171011

Glidden Trade Trade paint Glidden paint Vinyl paint Matt paint News 171011

Hitachi Air conditioning Domestic heating Control systems Heat pumps News 171011

JS Humidifiers Steam humidifiers Air curtains Evaporative humidifiers Humidification systems News 201011

Kawneer Curtain walling Architectural aluminium systems Commercial entrance doors News 181011

Krannich Solar Solar panels Solar power Photovoltaic panels Solar heating News 171011

Levolux Solar shading Timber fins Ventilation louvres Solar shade News 181011

Longden Timber doors Door hardware Door sets Commercial doors News 191011

Marley Eternit Exterior wall cladding Fibre cement cladding Wall cladding News 171011

Prysmian Power cable Armoured power cable Fire resistant cable News 171011

Redland Slate tiles Roof tiles Roofing sheets Clay tiles News 171011

Sandtoft Roof tiles Clay tiles Slate tiles Roof slate News 201011

Sandtoft Solar panels Solar systems Roof tiles Slate tiles News 171011

Schueco Steel door Door systems Facade systems Steel facade News 211011

Socomec Uninterruptible power supplies UPS systems Critical power systems News 171011

Steadmans Wall panels Insulated panels Cladding panels Roof panels News 171011

The Safety Letterbox Co Letter boxes Letter flaps Mail boxes Mailing systems News 171011

Transdek Loading bay equipment Goods lifts Mezzanine floor lifts News 201011

Tyco Raychem Frost protection Pipe protection Trace heating Thermal controls News 191011

Unigro Research facilities Environment chambers Glass houses Controlled environments News 201011

UPS Ltd Uninterruptible power supply UPS systems Standby power systems News 201011

Ventrolla Timber windows Casement windows Sash windows Timber doors News 171011

Weatherite Building Services Kitchen ventilation Ventilated ceilings Commercial ventilation Ventilation systems News 181011

News Categories:
Aluminium systems Curtain walling Entrance systems Structural glass

Arundel Jones Associates Ltd
Hill Farm Business Park, Linton Hill, Maidstone, Kent ME17 4AL
Tel : 01622 745333

news@buildingdesign.co.uk


See also:

| BuildingDesign Directory | BuildingDesign Tenders |

|BuildingDesign News Archives | 2006 | 2007 | 2008 | 2009

| BuildingDesign Recruitment | AJA Part Time Jobs Board |

© 2010 copyright all rights reserved Registered in England and Wales No. 07334149