Subscribe to newsletter

Submit Article

 



Editors Note: Transdek provide:

  • Loading bay equipment

  • Goods lifts

  • Mezzanine floor lifts

Home

Advertise Here

Request Quote

CPD Seminar

 

Advertise Job

Advertise Job

Terms & Conditions

Terms & Conditions

Contact Building Design

Contact Building Design

e-mail Building Design

e-mail Building Design

 

- Building Design - Services & Construction Products Index

Request Information

Links Page

 


 

TRANSDEK Calls For New Double-Deck Loading Bay Height

Transdek, the UKs leading specialists in double deck loading solutions, is recommending the introduction of a new loading bay height at distribution centres handling high volumes of deliveries through fixed double deck trailers.

Most conventional loading bays are constructed with a raised floor height of 1,200mm to enable a straight run through of loads onto single deck trailers, with minor height adjustments made using dock levellers. With the increased use of more efficient delivery solutions using double deck trailers, which typically feature 900mm and 2.9m decks, lifts are essential equipment to fill both levels.

This necessitates the double handling of product from the warehouse onto the lift and then into the trailer, which slows the loading process down. To address this issue, Transdek believes a new approach to distribution centre design should be adopted that incorporates a gradual gradient in double deck bays to allow operatives a direct run on and off the lower vehicle deck.

Leon Butler, Operations Director at Transdek, explains: Were continually looking at ways to improve the efficiency of loading vehicles. In the case of fixed double deck trailers we believe new distribution centres should be built with dedicated double deck loading bays with a descending gradient to around 900mm. This way vehicle fill time can be significantly reduced, which drives down costs, speeds up turnaround and with less handling, improves safety.

Weve found that in trials this approach has seen typical fixed double deck vehicle turnaround times cut to as little as 50-minutes.

Transdek has also developed an alternative solution that will deliver the same benefits for existing sites by elevating the vehicle.

Butler continues: By installing wheel ramps in the loading bay, trucks reverse as normal and the lower vehicle floor rises to integrate seamlessly with the dock. These ramps are tailor made to marry the vehicle to the specific dock height.

The company has also modified its hydraulic double deck lifts to include a variable dock plate that can accommodate a range of dock heights. These modular units, which are designed as pre-clad, pre-tested loadhouse units, can also be easily moved to another bay or location with a different dock height.

E-mail Transdek

 


Artemide Architectural lighting Lighting systems Down lights Internal lighting News 121011

Balcony Systems Glass balconies Juliet balconies Glass balustrades Patio doors News 131011

Bilco Roof vents Automatic vents Smoke ventilation Roof hatches News 111011

Brett Martin Plastic sheets Drainage pipe Plastic pipe Rainwater systems News 131011

Cembrit Roof tiles Fibre cement slates Fibre cement cladding News 111011

Clipso Wall panels Stretch ceilings Fabric ceilings Acoustic ceilings News 141011

Collingwood Lighting systems Commercial lighting LED lights Strip lighting News 141011

Dimplex Electric heating Heat pumps Space heaters Air curtains News 121011

Dow Insulation products Floor insulation Roof insulation Wall insulation News 121011

Dulux Trade Dulux paint Dulux trade Trade paint Gloss paint News 121011

Ergolet Lifting hoists Disabled toilets Lifting systems Hoist systems News 121011

Flakt Woods Air handling Ventilation systems Roof ventilation Roof fans News 131011

Forbo Flooring Systems Flooring systems Carpet tiles Floor coverings Linoleum flooring News 141011

Forticrete Concrete products Building products Roof tiles Walling stone News 141011

GreenBrook Cabinet lights Lighting systems Electrical products LED lighting News 131011

Hanson Formpave Block paving Block paving bricks Water harvesting systems News 111011

Jablite Insulation products Roof insulation Wall insulation Floor insulation News 141011

Jeld-Wen Internal doors External doors Sliding doors French doors News 121011

John Brash Decking boards Antislip decking Timber decking Roof battens News 121011

Knauf Marmorit External wall insulation Insulation products Knauf wall insulation News 121011

Komfort Office partitions Glass partitions Movable walls Glass doors News 131011

Lakesmere Building services Rainscreen cladding Flat roofs Curtain walling News 131011

Marley Alutec Aluminium gutters Drainage systems Drainage pipe Rainwater system News 131011

Marley Alutec Rainwater systems Aluminium gutters Gutter systems Aluminium downpipes News 121011

Marley Eternit Fibre cement cladding Weatherboard cladding Cladding fixing systems News 131011

Marley Eternit Slate tiles Roof tilesInterlocking tiles Clay tiles News 141011

Marshall-Tufflex Cable management Electrical switches Cable trays Waterproof switches News 141011

Marshall-Tufflex Cable management Energy management Data services Cable trays News 111011

Megaman Energy Saving Tips Lighting Tips Luxmeter iPhone App News 101011

MG Renewables Solar panels PV systems Photovoltaic panels Solar heating News 121011

Northcot Brick Clay bricks House bricks Facing bricks Handmade bricks News 131011

Panasonic Air conditioning Air control Air system Air ventilation News 141011

Passivent Natural ventilation Passive ventilation Natural daylight Domestic ventilation News 141011

Siemens Building management systems BMS systems Building automation systems News 111011

Socomec UPS System Emergency Power Static UPS Electrical Switchgear News 101011

Spilka Window hinges Aluminium window hinges Patio door hinges News 131011

Stewart Milne Timber frame construction Timber frame buildings Timber frame News 131011

Sustainable Options Street furniture Plastic benches Plastic tables Plastic fencing News 121011

Thorn Lighting products Internal lighting Commercial lighting LED lighting News 141011

Total Home Environment Heat pumps Heat recovery ventilation Central vacuum systems News 141011

Trox Energy efficiency Air conditioning Chilled beams Ventilation systems News 101011

Wade Drainage products Floor drains Roof drainage Linear drainage News 121011

Washroom Washroom Bathroom suites Shower cubicles Vanity units Bathroom sinks News 141011

Windhager Biomass boilers Solar thermal systems Central heating cooker News 141011

News Categories:
Loading bay equipment Goods lifts Mezzanine floor lifts

Arundel Jones Associates Ltd
Hill Farm Business Park, Linton Hill, Maidstone, Kent ME17 4AL
Tel : 01622 745333

news@buildingdesign.co.uk


See also:

| BuildingDesign Directory | BuildingDesign Tenders |

|BuildingDesign News Archives | 2006 | 2007 | 2008 | 2009

| BuildingDesign Recruitment | AJA Part Time Jobs Board |

2010 copyright all rights reserved Registered in England and Wales No. 07334149