Subscribe to newsletter

Submit Article

 



Editors Note: Viessmann provide:

  • Domestic heating systems

  • Commercial heating systems

  • Renewable heat

Home

Advertise Here

Request Quote

CPD Seminar

 

Advertise Job

Advertise Job

Terms & Conditions

Terms & Conditions

Contact Building Design

Contact Building Design

e-mail Building Design

e-mail Building Design

 

- Building Design - Services & Construction Products Index

Request Information

Links Page

 


 

VIESSMANN Welcomes The Government’s “Careful” Renewable Heat Incentive (RHI) Proposals

Leading international manufacturer of domestic and commercial heating systems welcomes incentive levels which match the industry’s ability to develop, but questions “counterproductive” air source heat pump uncertainty.

Viessmann Ltd, part of the Viessmann Group of Companies and one of the leading international manufacturers of heating systems, welcomes UK Government’s RHI proposal announcement (10/3/11). Viessmann’s industry perspective is unique in that its product range encompasses all fuel types and applications; from traditional oil and gas-fired boilers to renewable solar thermal and photovoltaic systems, combined heat and power modules (CHP), ground, air and water sourced heat pumps and biomass boilers. The company has been manufacturing renewable heating systems for almost 40 years and sells 500,000 m2 of solar collectors globally per year.

In relation to the impact on the domestic heating market, Peter Frost, managing director of Viessmann Ltd, comments:

“The Government seems to have chosen a more careful and selected route to introduce renewable technology into the domestic market. To us, this makes sense as the renewables market is still very young and is challenged by the need for accurate product and application information, and the required installer training. The potential for efficiency loss is much greater in a renewable heating system installation than a traditional one. The technologies need to be correctly specified by individual application to realistic parameters and there is still a lot of learning to do by those adopting and installing them.

“We are surprised to hear that the RHI starts later than expected in October 2012, but bringing this in line with the Green Deal scheme makes sense. Also, introducing a premium payment from July should help to quell industry disappointment.

“It is still not clear what tariffs, by technology type, will be introduced in 2012. Air source heat pumps (ASHPs) appear to have been singled out and will be the biggest loser. The decision to provide a one-off cash payment of £850 for an ASHP today, without any tariff information for next year, could be counterproductive.

“ASHPs are as good as any other renewable technology when used correctly and we worry that this uncertainty may lead customers to move away from this technology.

“Viessmann believes that the most effective step for most UK homeowners now is the installation of a weather-compensated gas condensing boiler combined with a solar thermal system. This can provide reductions of up to 35 percent in fuel bills if the system is used for domestic hot water and central heating. The condensing boiler is the best technology available to suit the UK’s present needs and capacity as we adapt to using more renewable energy sources, yet around 20 million homes are without it.”

In relation to the impact on the commercial heating market, Peter Frost, managing director of Viessmann Ltd, continues:

“It is great news for the commercial sector that the RHI is starting in July 2011, even though the feed-in tariff is less than originally proposed. We support the tariff split for biomass boilers which means that about two thirds of the total demand will enjoy a higher tariff. As commercial applications are all metered, biomass energy production can now be monitored so that it is used appropriately and not wasted.

“Again, we are surprised that ASHPs are not going to be considered until October 2012. The RHI’s co-efficient of performance (COP) target level for ground source heat pumps (GSHPs) is set to greater than 2.9. This contradicts the Microgeneration Certification Scheme’s (MCS) requirement of 3.5 for heat pumps less than 45kW and the minimum level of 4.0 for the Enhanced Capital Allowance Scheme (an initiative to encourage businesses to invest in low carbon energy saving equipment). We wonder why the RHI document quotes a lower figure.

“In conclusion, the new RHI is a start and it is up to the industry to make it work to its best so we can achieve our carbon reduction goal by 2020. Viessmann is committed to playing a leading role in the development of renewable technology internationally, and in providing support to end-users and installers as market understanding and the adoption of this technology grows.”

E-mail Viessmann

Viessmann Product Information


3M Hearing Protection EARfit Validation System News 090311

Cablofil Steel Wire Tray Cable Ferguson Modular News 110311

C And B Systems Online And E Commerce Division News 070311

Crown Paints Launches Carbon Revolution News 100311

Danfoss High Performance Air Source Heat Pumps News 070311

Danfoss Power Electronics Hannover Fair News 2011 090311

Dorma Door Closers Loreto College Manchester News 090311

Dulux Trade Weathershield Professional Colour Guide News 100311

ENER G Clean Technology Engineering Apprenticeship Schemes News 070311

ENER-G Ground Source Heat Pumps Longfield Academy News 110311

Fulton Launches Vertical Tubeless Boilers News 110311

Fulton ModSync Boilers Gordons Fine Foods News 090311

Fulton Steam Boilers Atlantic Linen Services News 100311

Greenbarnes Recycled Plastic Notice Boards National Trust News 090311

Hanson Thermalite Blocks Code For Sustainable Homes News 090311

Ideal Standard Launches Playa Bathroom Range News 090311

Levolux Solar Shading Terminal 4 Heathrow Airport News 100311

Monodraught National Homebuilding And Renovating Show News 2011 100311

Osram LED Linear light Flex Protect News 070311

Osram Lighing Scheme The Royal Military Academy Sandhrust News 090311

Pilkington Planar Northern Ballet And Phoenix Dance News 070311

Sandtoft Best Roof Covering Homebuilding And Renovating Show News 110311

SE Controls Fund Raising Macmillan Cancer Support News 070311

SE Controls Global Expansion Natural Ventilation News 110311

SE Controls Reftrofit Solutions For Ventilation And Smoke Control News 100311

Siemens UK Business Superbrand For 2011 News 070311

Spirax Sarco Flash Steam Recovery Systems British Bakels News 090311

Spirax Sarco Steam Boiler Reverse Osmosis News 110311

Sunfold Sliding Door Systems National Homebuilding Show News 070311

Sureset Homebuilding And Renovating Show 2011- News 070311

Sureset New Range Of Permeable Paving Slabs News 090311

Tarkett 2011 Commercial Collection Catalogue News 090311

Trend Energy Savings Bridgewater Place Leeds News 080311

News Categories:
Domestic heating systems Commercial heating systems Renewable heat

Arundel Jones Associates Ltd
Hill Farm Business Park, Linton Hill, Maidstone, Kent ME17 4AL
Tel : 01622 745333

news@buildingdesign.co.uk


See also:

| BuildingDesign Directory | BuildingDesign Tenders |

|BuildingDesign News Archives | 2006 | 2007 | 2008 | 2009

| BuildingDesign Recruitment | AJA Part Time Jobs Board |

© 2010 copyright all rights reserved Registered in England and Wales No. 07334149