Subscribe to newsletter

Submit Article

 



Editors Note: Elliott Off-Site Building Solutions provide:

  • Modular buildings

  • Off site buildings

  • Steel framed buildings

Home

Advertise Here

Request Quote

CPD Seminar

 

Advertise Job

Advertise Job

Terms & Conditions

Terms & Conditions

Contact Building Design

Contact Building Design

e-mail Building Design

e-mail Building Design

 

- Building Design - Services & Construction Products Index

Request Information

Links Page

 


 

ELLIOTT OFF-SITE BUILDING SOLUTIONS - Clean Bill Of Health For Elliott At Scarborough Hospital

Elliott Off-Site Building Solutions has completed the prestigious new Maple ward at Scarborough Royal infirmary.

The building was commissioned by Scarborough and North East Yorkshire Healthcare NHS Trust as part of its commitment to move away from mixed-sex wards.

The 28 bed facility was constructed using Elliott Off-Site Building Solutions’ innovative hybrid construction system. This enabled large elements of the building to be completed off-site ensuring a much shorter build schedule as well as ISO9001 assured levels of quality.

Maple Ward consists of 7no three bed wards along with seven Approved Document M (Mobility) single bed en-suite rooms, making up the 28 bed spaces. Additional facilities include a quite room for patients, offices, along with changing and rest room for medical staff.

The building is fully compliant with Health Technical Memoranda (HTM) and Health Building Notes (HBN) standards.

A key requirement of the client was that the single storey building should be designed so that additional storeys could be added in the future.

Elliott therefore designed the initial single storey building using a steel frame, providing the structure with adequate strength to support subsequent storeys, in conjunction with insulated timber infill panels and an exterior brick cladding.

The timber infill panels are designed with an insulated cavity to provide the building with excellent thermal performance, which also reduces construction times compared to conventional build methods. Once the steel frame and timber panels were installed the whole structure was clad in brick to match the adjacent ward block

The roof was designed with a nominal pitch to allow subsequent storeys to be added with minimal alterations to the building.

Maple Ward is linked to the existing hospital building by a covered walkway that is again constructed using the principles of Modern Methods of Construction, highlighting the adaptability of Elliott’s hybrid system for all types and sizes of buildings.

Proximity of the Maple Ward to an RAF Sea King rescue helicopter landing pad had an influence on the design of the building too. The structure had to withstand the powerful downdraft created as the helicopter took-off and landed on the pad.

Elliott Off-site Building Solutions overcame this issue by ensuring all elevations facing the helipad avoided any apertures in the wall, for instance, to accommodate doors or windows. The exposed elements of the roof were constructed using upgraded trusses and frame connectors to again withstand the downdraft created by the helicopter blades.

Elliott was involved in all M&E aspects of the project including installation of medical gases, water, access control, CCTV along with nurse call systems and fire alarms.

“We have been delighted with the professionalism and expertise provided by Elliott Off-Site Building Solutions on this complex build programme,” said Malcolm Miller from Scarborough and North East Yorkshire Healthcare NHS Trust. “Their experience in the healthcare sector was a definite advantage and meant that they could handle all aspects of the project through to final hand over.”

Elliott Off-Site Building Solutions has over 45 years of delivering innovative off-site design and build solutions and is able to help clients achieve the highest environmental ratings and carbon neutrality.

Elliott operates a company wide integrated management system that meets the requirements of ISO 9001 Quality, OHSAS 18001 Occupational Health and Safety Management Systems and ISO 14001 Environmental.

For more information on Elliott Off-Site Building Solutions please email:

E-mail Elliott Off-Site Building Solutions

Elliott Product Information


Balcony Systems Glass Juliette Balconies News 140211

Baxi Low To Zero Carbon Technologies Ecobuild 2011 News 170211

British Gypsum Acoustic Ceilings At Surface Design Show 2011 News 140211

Carlo Gavazzi PIR Detector Smart House Automation Range News 140211

Dimplex Zero Carbon Solar PV Southampton Headquarters News 170211

Dow Simplifying Standards At Ecobuild 2011 News 160211

Dulux Woodcare Protection Falstone Walk Fawdon News 170211

Eaton-Williams Neutralising Heat Data Centre World And Expo News 170211

Eco Fence And Doors Environmentally Friendly Furniture Pub Gardens News 140211

ENER-G Sustainable Solutions At Ecobuild 2011 News 170211

Eurobrick Insulated Brick Slip System Ecobuild 2011 News 160211

Evac Chair Universal Evacuation Solution Stairway Descent News 150211

Hanson Exploding The Myths Ecobuild 2011 News 160211

Hanson Formpave Partnership With Cool Planet And Radiant Heating News 140211

Harlequin Website Extends China Korea Japan News 150211

Honeywell Heating Controls Ecobuild 2011 News 160211

Ibstock Brick Selector Technical Brochure News 140211

ICI Paints Decorative Paints Performance Coatings Ecobuild 2011 News 170211

Ideal Standard Top 100 Water Saving Products Ecobuild News 170211

Kingspan New Flooring Range Kingspan Acoustideck News 180211

Knauf Drywall Lightweight Building Products Ecobuild 2011 News 170211

Lafarge Plasterboard LaDura Multipurpose Gypsum Board News 140211

Lakesmere New Thru Wall System News 140211

Leaderflush Shapland Pivette Articulated Door News 150211

Monodraught Windcatcher Goldsmiths University Of London News 180211

Pilkington Attendance At Ecobuild 2011 News 150211

Polyflor Vinyl Floorcovering Sound Craft Ltd News 150211

Polypipe Soil Stack Replacement Scheme Birmingham News 140211

Sanyo CO2 Heat Pumps Beechdale Manor Nottingham News 140211

SAS International Double Hook System For Ceiling Panels And Rafts News 140211

Schueco New Outward Opening Window News News 150211

SIG Modular Green Roof Systems Aldingbourne Nurseries News 180211

SIG Rhepanol Green Roof Manaton House Dartmoor News 140211

Steadmans Meta Slate Tiles Reading Day Centre News 150211

Tarkett Sports Flooring Priory School Edgbaston News 140211

Trend Installing Building Energy Management Systems Qualification News 180211

Uniflair Data Centre Word And Expo 2011 News 180211

UPS Ltd Three Phase UPS Data Centre World 2011 News 170211

Ventrolla Sash Windows University College School Hampstead News 140211

Weatherite Jim Gale Appointed Group MD News 170211

Wienerberger Sandtoft New Products At Ecobuild 2011 News 160211

News Categories:
Modular buildings Off site buildings Steel framed buildings

Arundel Jones Associates Ltd
Hill Farm Business Park, Linton Hill, Maidstone, Kent ME17 4AL
Tel : 01622 745333

news@buildingdesign.co.uk


See also:

| BuildingDesign Directory | BuildingDesign Tenders |

|BuildingDesign News Archives | 2006 | 2007 | 2008 | 2009

| BuildingDesign Recruitment | AJA Part Time Jobs Board |

© 2010 copyright all rights reserved Registered in England and Wales No. 07334149